UNDERSTAND YOUR RESULT
How to use this tool
- Enter length and width in metres and compacted depth in millimetres.
- Confirm density with your supplier and choose an extra allowance.
- Calculate the purchase estimate and distinguish metric tonnes from US short tons.
How it works
Volume = length × width × thickness. Mass = volume × density; an optional allowance increases the purchase estimate.
10 m × 5 m × 50 mm = 2.5 m³. At 2,400 kg/m³, this is 6 metric tonnes before allowance.
Common mistake to avoid
Density is an assumption, not a universal constant. Do not confuse loose depth with compacted depth.
Limits and assumptions
Confirm compacted density with your supplier. This is a quantity estimate, not a pavement design.
Common questions
Is the allowance included in the tonnage?
Yes. Purchase estimates include your percentage allowance; the result also shows mass before allowance.
Are metric tonnes and US tons the same?
No. A metric tonne is 1,000 kg; a US short ton is 2,000 lb, or about 907.185 kg.